Completed projects in 2017 2018

In terms of attracting foreign investment in Zhambyl region , investment projects are realized and implemented with participation of foreign investors from China, the Russian Federation, the United Kingdom, the Netherlands, France, Czech Republic, Italy, Iran, Germany, Turkey, Japan, UAE, Malaysia, etc.
Today, 15 investment projects have been realized with the participation of foreign investors, amounting to $ 622 million.

  • 1. Project “VICAT GroupCompany“ for the construction of a cement plant . Cost of the project: $ 238 million (France). Implementation period: 2007-2010;
  • 2. Project by Fosfa a.s. on the production of sodium hexametaphosphate and food phosphate together with “Kazphosphate” LLP. Cost of the project: $ 3.4 million (Czech Republic). Implementation period: 2011-2012
  • 3. Project «SevrimSrl» Ltd for the production of pure wool worsted yarn on the basis of “POSH-Taraz Factory“LLP. Cost of the project: $ 4.4 million (Italy). Implementation period: 2007-2010
  • 4. Project «Knauff-gypsum» LLP for the production of gypsum and building products. Cost of the project: $ 5.2 million (Germany). Implementation period: 2004
  • 5. Project «Kaz-Ir-Agro» LLP for processing oilseeds. Cost of the project: $ 1.4 million (Iran). Implementation period: 2011-2012
  • 6. Project «UnitedGreen» on the construction of a solar power station «BurnoeSolar». Cost of the project: $ 125 million (United Kingdom). Implementation period: 2015
  • 7. Project «ADEAS Development» for the creation of a meat processing complex. Cost of the project: $ 13.8 million (United Arab Emirates). Implementation period: 2016
  • 8. Project «COOKEY» SystemsCo. Ltd.» processing of licorice root. Cost of the project: $ 3.2 million.
  • Implementation period: 2016
  • 9. Project «KCRF finance international B.V.» construction of a plant for the production of dry construction mixtures. Cost of the project: $ 17 million. Implementation period: 2016
  • 10. Project «Good Look» LLP construction of an automated complex for the production of feed with a capacity of 36,000 tons per year. Cost of the project: $ 32 million. Implementation period: 2017
  • 11. Project «Rola Yan» LLP modernization of the plant for the production of pasta with a capacity of 9,000 tons per year. Cost of the project: $ 830 thousand. Implementation period: 2017
  • 12. Project “EuroChem Karatau“on the creation of a mining complex. Cost of the project: $ 126 million. Implementation period: 2012-2015
  • 13. The United Green project for the construction of the solar power station BurnoeSolar2 (Stage 2), costing KZT24.9 billion (Great Britain). Period of implementation of 2017-2018 years;
  • 14. The project of “Esenbaev” IE – construction of a plant for the production of refined oil. Cost of the project: 130 million tenge;
  • 15. “Farm Management” LLP project for construction of fattening cattle base for 1000 heads. Cost of the project: 200 million tenge.
  •  

Project “VICAT Group Company“ for the construction of a cement plant

  • Project name: Zhambyl Cement Production Company LLP
  • Investor: VICAT Group Company
  • The essence of the project: Construction of a cement plant
  • Project cost: 238 million USD
  • Implementation period: 2007-2010
  • Location of the project: Moiynkum district, Mynaral village
  • Investor participation: the French group Vicat owns 60%, Kazkommerts Invest – 30%, the International Finance Corporation (IFC), a division of the World Bank – 10%.

                                                   

Construction of a plant for the production of sodium hexametaphosphate and food phosphates in Zhambyl region

  • Project Name: Kazphosphate LLP
  • Investor: Czech company “Fosfa a.s.”
  • The essence of the project: Construction of a plant for the production of sodium hexametaphosphate and food phosphates in the Zhambyl region
  • Project cost: $ 1.4 million
  • Project capacity: 4 thousand tons of finished products per year
  • Implementation period: 2011-2012
  • Location of the project: Zhambyl region
  • Investor’s participation: The total amount of the project is KZT 500 mln, of which KZT 250 mln is the funds of Kazphosphate LLP, the second half is the investment of the Czech company “Fosfa a.s.”

                    

The project “SevrimSrl” Ltd for the production of pure wool worsted yarn on the basis of “POSH-Taraz Factory” LLP

  • Project name: “POSH-Taraz Factory” LLP
  • Investor: SevrimSrl Ltd
  • The essence of the project: the production of pure wool worsted yarn on the basis of “Factory POSH-Taraz“LLP
  • Cost of the project: $ 4,4 million
  • Project capacity: 873.6 tons of tops / year
  • Implementation period: 2007-2010
  • Place of project implementation: Zhambyl region, Taraz city

The project of “Knauff-gypsum“LLP for the production of gypsum and building products

  • Project name: Knauff-gypsum LLP
  • The essence of the project: Construction of a plant for the production of gypsum and construction products
  • Project cost: $ 5.2 million
  • Implementation period: 2004
  • Place of project implementation: Zhambyl region

Project of Kaz-Ir-Agro LLP for processing oilseeds

  • Project name: Kaz-Ir-Agro LLP
  • The essence of the project: oilseed processing
  • Project cost: $ 1.4 million
  • Implementation period: 2011-2012
  • Place of project implementation: Zhambyl region, Shu district

                                                                                                        

Construction Solar power plant in Zhambyl region

  • Project name: Burnoye Solar -1 LLP
  • Investor: United Green (United Kingdom)
  • The essence of the project: Construction Solar power plant with a capacity of 50 MW
  • Project cost: $ 125 million
  • Project capacity: 75 million kW / h per year.
  • Implementation period : 2015.
  • Place of project implementation: Zhambyl region, Zhualy district

                                                                                                          

Creation of a highly technological production of meat products of the Halal standard

  • Project name: «Ontustik Halal Tagamdary» LLP
  • Investor: ADEAS Development , UAE
  • The essence of the project: Production of meat products of the “Halal“ standard
  • Project cost: $ 13.8 million
  • Project capacity: 5000 ton.year
  • Implementation period : 2016.
  • Place of project realization: Zhambyl region, Zhambyl district.

                                                                                                       

Plant for processing licorice root

  • Project name: KazMiya LLP
  • Investor: COKEY SystemsCo. Ltd., Japan
  • The essence of the project: Plant for processing licorice root
  • Project cost: $ 2.6 million
  • Project capacity: 300 tons per year.
  • Implementation period : 2016.
  • Place of project implementation: Zhambyl region, Shu district

                                                                                                   

Construction of a plant for the production of dry construction mixtures

  • Project Name: “Zhambylgips“ JSC
  • Investor: KCRF finance international B.V. Netherlands
  • The essence of the project: the construction of a plant for the production of dry construction mixtures
  • Project cost: $ 17 million
  • Project capacity: 270 thousand tons of dry building mixtures and plaster products
  • Implementation period: 2016
  • Place of project implementation: Zhambyl region, Taraz city

                                                                                                           

Construction of an automated feed production system

  • Project title: Good Look LLP
  • Investor: Germany
  • The essence of the project: Construction of an automated feed production system
    Cost of the project: $3,2 million
  • Period of implementation: 2015-2017
  • Place of project implementation: Zhambyl region, Taraz city

                                      Modernization of the plant for the production of pasta

  • Name of the project: «Rola Yan» LLP
  • Investor: China
  • The essence of the project: modernization of the plant for the production of pasta
    Project cost: 285 million tenge
  • Project capacity: 9000 tons per year
  • Period of implementation: 2017
  • Place of project implementation: Zhambyl region, Bayzak district

                                                                                                           

 

Creation of a mining complex

  • Project name: EuroChem-Karatau LLP
  • Investor: Russia
  • The essence of the project: creation of mining complex
  • Cost of the project: $ 126 million
  • Project capacity: 2 million tons per year
  • Realization period: 2002-2015
  • Place of project implementation: Zhambyl region, Sarysu district
  • Investor participation: EuroChem International Holding B.V. Russia (100%)

                                                                                                                      [/vc_column_text][/vc_column][/vc_row]

          Сonstruction of the solar power station BurnoeSolar2 (Stage 2)

  • Project name: United Green
  • Investor: Great Britain
  • The essence of the project: construction of the solar power station BurnoeSolar2 in Zhualy district
  • Cost of the project: 24.9 billion tenge
  • Project capacity: 100 MW (Stage 1 – 50 mW, Stage 2 – 50 mW)
  • Realization period: 2017-2018
  • Place of project implementation: Zhambyl region, Zhualy district
  • Investor participation: The company “United Green” (United Kingdom), Samruk-Kazyna Invest“ JSC, “NC SEC” Taraz “ JSC

                      Сonstruction of a plant for the production of refined oil

  • Project name: “Esenbaev” IE
  • Investor: Kazakhstan
  • The essence of the project: construction of a plant for the production of refined oil
  • Cost of the project: 130 million tenge
  • Project capacity: 12 thousand tons per year
  • Realization period: 2017-2018
  • Place of project implementation: Zhambyl region, Bayzak district

                         Сonstruction of fattening cattle base for 1000 heads

  • Project name: “Farm Management” LLP
  • Investor: Kazakhstan
  • The essence of the project: construction of fattening cattle base for 1000 heads in Zhambyl district
  • Cost of the project: 200 million tenge
  • Project capacity: 1000 heads per year
  • Realization period: 2017-2018
  • Place of project implementation: Zhambyl region, Zhambyl district